TC Glass

Job Location: Chester, Montana

Owner: Chester Public Schools

Architect: N/A

General Contractor: TC Glass

Building Type: Public School


TC Glass was awarded this Exterior Window Replacement Project for Chester-Joplin-Inverness High School.  Prior to our arrival, the existing building windows were boarded up and replaced with smaller windows to cut down on energy costs.  TC Glass was able to provide new high performance aluminum and go back to the original openings and still be energy efficient. Since school was out for the summer, the customer laid out a deadline for TC Glass to get the job done during the summer months.

TC Glass team was able to meet this deadline with proper scheduling and take into consideration the long lead times from the manufacturer.  Our team used a window panning system to cover up the old caulk joint on the brick, and void between brick and interior wall.

Upon completion of the project, client was extremely satisfied and could not believe how much natural light the new windows provided.  TC Glass has formed an excellent relationship with the Chester School District and recently completed another phase of window replacements.


Project Gallery

After                                                                 Before                                                              Before (wall)                                                    Installation